Title: 2nd Regional Stakeholder Forum on the Pak Beng Hydropower Project
Secondary reference: FORUM REPORT, 5 May 2017 in Vientiane
Author(s): Organisation: The Mekong River Commission Secretariat
Key words: Pak Beng recommendation dam design Water quality and Aquatic Ecology
Publication year: 2017
Available in folders: Energy (incl. Hydropower) MRC
File type (mime): application/pdf
File size: 3.16MB
Type of document: Published docs
Uploaded date/time: 2017-06-29 02:25:49
Accepted date/time: 2017-06-29 02:25:49
Accepted by: laofab@gmail.com
Download file: icon2nd-RSF-report-final.pdf
Downloads: 34