Title: Progress on the MRC Procedures for Notification, Prior Consultation and Agreement (PNPCA) Prior Consultation Process of the Proposed Sanakham Hydropower Project
Secondary reference:
Author(s): Name: Dr Ly Thim Organisation: Chief River Basin Planner, MRC Secretariat
Key words: Prior consultation Overview Sanakham Hydropower Project
Publication year: 2021
Available in folders: Mekong dams
File type (mime): application/pdf
File size: 1.87MB
Type of document: Presentation
Uploaded date/time: 2021-12-10 09:26:50
Accepted date/time: 2021-12-10 09:26:50
Accepted by: laofab@gmail.com
Download file: iconProgress_of_the_PC_process_of_SNHPP.pdf
Downloads: 212