Title: Appendix C: Resettlement Action Plan
Secondary reference: Don Sahong Hydroelectric Project, Feasibility Study
Author(s): Name: PEC Consult /Australian Power and Water
Name: Mega First Corporation Berhad
Key words: Don Sahong dams EIA hydropower
Publication year: 2007
Available in folders: Don Sahong
File type (mime): application/pdf
File size: 5.37MB
Type of document: Grey literature
Uploaded date/time: 2010-06-30 02:25:14
Accepted date/time: 2010-06-30 07:38:25
Accepted by: laofab@gmail.com
Download file: iconAPENDIX_C_.pdf
Downloads: 22