Title: Appendix F: Unexploded Ordnance (UXO)
Secondary reference: Don Sahong Hydroelectric Project, Feasibility Study
Author(s): Name: PEC Consult /Australian Power and Water
Name: Mega First Corporation Berhad
Key words: Don Sahong dams EIA hydropower
Publication year: 2007
Available in folders: Don Sahong
File type (mime): application/pdf
File size: 678.88KB
Type of document: Grey literature
Uploaded date/time: 2010-06-30 03:33:20
Accepted date/time: 2010-06-30 07:41:06
Accepted by: laofab@gmail.com
Download file: iconAPENDIX_F_.pdf
Downloads: 20