| Title: | Appendix J: Impact of Ramsar Convention |
|---|---|
| Secondary reference: | Don Sahong Hydroelectric Project, Feasibility Study |
| Author(s): |
Name: PEC Consult /Australian Power and Water
Name: Mega First Corporation Berhad |
| Key words: | Don Sahong dams EIA hydropower |
| Publication year: | 2007 |
| Available in folders: | Don Sahong |
| File type (mime): | application/pdf |
| File size: | 1.47MB |
| Type of document: | Grey literature |
| Uploaded date/time: | 2010-06-30 04:18:44 |
| Accepted date/time: | 2010-06-30 07:44:43 |
| Accepted by: | laofab@gmail.com |
| Download file: | APENDIX_J_.pdf |
| Downloads: | 16 |
