Title: Appendix K: Public Disclosure Meetings, 25-26 Oct 06
Secondary reference: Don Sahong Hydroelectric Project, Feasibility Study
Author(s): Name: PEC Consult /Australian Power and Water
Name: Mega First Corporation Berhad
Key words: Don Sahong dams EIA hydropower
Publication year: 2007
Available in folders: Don Sahong
File type (mime): application/pdf
File size: 1.15MB
Type of document: Grey literature
Uploaded date/time: 2010-06-30 04:27:32
Accepted date/time: 2010-06-30 07:45:27
Accepted by: laofab@gmail.com
Download file: iconAPENDIX_K_.pdf
Downloads: 17